Bulevar Vojvode Mišića Br.81.

11000 Belgrade, Serbia

011/265-35-64; 011/265-36-78; 065/826-54-12

Available 7 days a week

Mon-Fri: 9:00am - 5:00pm

office@aitgroup.rs

Avala Tower

The main project of the central monitoring and control system (CSNU) encompasses the following technical and technological systems:

  • Substation
  • Diesel electric generators
  • Lighting system
  • HVAC system (Heating, Ventilation, and Air Conditioning)

Two monitoring centers are planned in accordance with the technology of the facilities. In the entrance hall area of the tower facilities, a monitoring and control system is planned for systems that are important for the safety and functioning of the tower facilities, including:

  • Interior lighting of the tower facilities
  • Exterior lighting of the complex and the tower
  • Cooling with climate cabinets
  • Cooling with split systems
  • Local ventilation
  • Ventilation rooms
  • Heating of pipelines with heating cables
  • Underfloor heating with heating cables
  • Elevators
  • Fire extinguishing system with water mist
  • Ventilation for pressurizing the elevator shaft
  • Fire doors
  • Smoke vent windows
  • Fire dampers