The main project of the central monitoring and control system (CSNU) encompasses the following technical and technological systems:
- Substation
- Diesel electric generators
- Lighting system
- HVAC system (Heating, Ventilation, and Air Conditioning)
Two monitoring centers are planned in accordance with the technology of the facilities. In the entrance hall area of the tower facilities, a monitoring and control system is planned for systems that are important for the safety and functioning of the tower facilities, including:
- Interior lighting of the tower facilities
- Exterior lighting of the complex and the tower
- Cooling with climate cabinets
- Cooling with split systems
- Local ventilation
- Ventilation rooms
- Heating of pipelines with heating cables
- Underfloor heating with heating cables
- Elevators
- Fire extinguishing system with water mist
- Ventilation for pressurizing the elevator shaft
- Fire doors
- Smoke vent windows
- Fire dampers